Lockheed demos future evolution of GPS III satellite design – Satellite News Digest

In December, the first GPS III satellite completed system-level Thermal Vacuum (TVAC) testing, validating Lockheed Martin’s design and manufacturing processes. Seven more GPS III satellites are following the first one in production flow at Lockheed Martin’s GPS Processing Facility in Denver.

http://www.sat-nd.com/archive/?id=2016052004

Share This Article